    Ultra-low Emission Performance
  • NUMBER
  • NAME
  • capacity
  • type
  • Desulphurization
  • 1
  • Shenhua GuoNeng Ningxia Yanhu Power Plant Phase II desulfurization system EPC General Contract
  • 2×1000MW
  • Newly build
  • WFGD
  • 2
  • Huaruncaofeidian power plant supercritical coal generating units flue gas desulphurization dust integration system engineering
  • 2×1000MW
  • Newly build
  • WFGD
  • 3
  • Gansu Electric Power Plant Changle Power Plant Peaks Thermal Power Project 4 × 1000MW(Units 1 and 2) Project Desulfuration Island EPC General Contract Project
  • 2×1000MW
  • Newly build
  • WFGD
  • 4
  • Super Low Emission Transformation of 2 × 1000MW Units in the Third Phase of China Electric Power International Pingyi
  • 2×1000MW
  • Reform
  • WFGD
  • 5
  • Renovation of desulfurization parts of units 1 and 2 of Huaneng Haimen Power Plant
  • 2×1000MW
  • Reform
  • Seawater desulfurization
  • 6
  • High-efficiency desulphurization and collaborative dedusting of unit 3 of Huaneng Yuhuan Power Plant
  • 1×1000MW
  • Reform
  • WFGD
  • 7
  • Renovation of ultra-low emission desulphurization for unit 4 of Huaneng Yuhuan Power Plant
  • 1×1000MW
  • Reform
  • WFGD
  • 8
  • Jiangsu Nantong Power Generation Co., Ltd.. No. 1 Unit Efficient desulphurization and coordinated dust removal renovation project
  • 1×1000MW
  • Reform
  • WFGD
  • 9
  • Reconstruction Project of High Efficiency Desulfurization Coordination Dust Collection for Unit 2 of Jiangsu Nantong Power Generation Co., Ltd.
  • 1×1000MW
  • Reform
  • WFGD
  • 10
  • Desulfurization Project of Unit 1 and Unit 2 of "Upper Large Pressure and Small Pressure" Project of Huaneng Changxing Power Plant Coal-fired Unit
  • 2×660MW
  • Newly build
  • WFGD
  • 11
  • Integrated Project of Flue Gas Desulfurization and Dust Removal for Ultra-Supercritical Coal-fired Generator Units in Huarun Power Plant
  • 2×660MW
  • Newly build
  • WFGD
  • 12
  • EPC Desulfurization Project of Shenhua Guoneng Chongqing Power Plant Environmental Protection Relocation Project
  • 2×660MW
  • Newly build
  • WFGD
  • 13
  • Desulfurization Island of Unit 1 and Unit 2 of Beishan Power Plant, Wucaiwan, Zhundong, Xinjiang (2 x 660MW)
  • 2×660MW
  • Newly build
  • WFGD
  • 14
  • Shenhua Shendong Electric Power Co. Ltd. Wucaiwan Power Plant, Jundong, 2nd batch of auxiliary equipment-flue gas desulfurization in 2x660MW Phase II Project
  • 2×660MW
  • Newly build
  • WFGD
  • 15
  • Revamping Project for Desulfurization of No.1 and No.2 Boilers in Huaneng Handfeng Power Plant
  • 2×660MW
  • Newly build
  • WFGD
  • 16
  • Second batch of auxiliary equipment procurement for Shangda Large Pressure and Small New Construction Project of Huaneng Yantai Bajiao Power Plant
  • 2×670MW
  • Newly build
  • WFGD
  • 17
  • Revamping of Shenhua Guoneng Yuanyanghu Power Plant Phase I Flue Gas Desulfurization and Capacity Increasing
  • 2×660MW
  • Reform
  • WFGD
  • 18
  • EP Project of Lujiang 2*660 MW Generator Unit Project in Hefei, Shen-Wan
  • 2×660MW
  • Reform
  • WFGD
  • 19
  • Desulfurization Project Design, Construction and Commissioning Guidance for 2X660MW Unit of Beiyi Power Plant, Wucaiwan, Xinjiang, and Subcontract for Specified Equipment Supply
  • 2×660MW
  • Reform
  • WFGD
  • 20
  • Revamping Project for Desulfurization and Efficiency Improvement of Unit No.5 in Phase III of Huaneng Shangan Power Plant
  • 1×660MW
  • Reform
  • WFGD
  • 21
  • Integrated Reform of EPC for Desulfurization and Dust Removal of 3 x 650 MW Supercritical Unit in Huarun Electric Power (Changshu) Co., Ltd.
  • 3×650MW
  • Reform
  • WFGD
  • 22
  • Revamping EPC for Super Net Emission of Desulfurization System of Coal-fired Units in Huanggang Dabieshan Power Generation Co., Ltd.
  • 2×640MW
  • Reform
  • WFGD
  • 23
  • Desulfurization Reconstruction Project of Zhangjiagang Shazhou Electric Power Co., Ltd.
  • 2×630MW
  • Reform
  • WFGD
  • 24
  • Revamping Project of Desulfurization and Efficiency Improvement of Huaneng Taicang Power Plant Phase II 2 *630 MW Unit
  • 2×630MW
  • Reform
  • WFGD
  • 25
  • Jiangsu Zhenjiang Power Generation Co., Ltd. #5 Boiler Ultra-low Emission Desulfurization and Dust Removal Integrated Renovation EPC General Contract
  • 1×630MW
  • Reform
  • WFGD
  • 26
  • Desulfurization and Efficiency Improvement Project of Sichuan Luzhou South Sichuan Power Generation Co., Ltd.
  • 2×600MW
  • Reform
  • WFGD
  • 27
  • Revamping Project for Desulfurization and Efficiency Improvement of Unit I of Huaneng Chaohu Power Plant
  • 2×600MW
  • Reform
  • WFGD
  • 28
  • Efficiency Improvement of Desulfurization System and Flue Gas Channel Optimized Retrofit Project for Units 3 and 4 of Huaneng Yingkou Power Plant Phase II
  • 2×600MW
  • Reform
  • WFGD
  • 29
  • EPC Project of Desulfurization and Dust Removal for Units 3 and 4 of Fujian Datang International Ningde Power Generation Co., Ltd.
  • 2×600MW
  • Reform
  • WFGD
  • 30
  • EPC Project of Desulfurization and Dust Removal Cooperative Renovation Project for 660 MW Units No. 1 and No. 2 of Fujian Datang International Ningde Power Generation Co., Ltd.
  • 2×600MW
  • Reform
  • WFGD
  • 31
  • High Efficiency Desulfurization and Cooperative Dust Removal Project for Unit 2 of Huaneng Zuoquan Power Plant
  • 1×600MW
  • Reform
  • WFGD
  • 32
  • Super-clean Revamping Project for Desulfurization of Unit 1 in Huaneng Zuoquan Power Plant
  • 1×600MW
  • Reform
  • WFGD
  • 33
  • Desulfurization Island Equipment of Huaneng Mianchi Cogeneration Project
  • 2×350MW
  • Newly build
  • WFGD
  • 34
  • EPC General Contracting for Flue Gas Desulfurization System of Cogeneration Project of Gansu Electric Power Investment Wuwei Thermal Power Co., Ltd.
  • 2×350MW
  • Newly build
  • WFGD
  • 35
  • Equipment Purchase for Environmental Protection Island of Huaneng Yushen Yulin Cogeneration Project
  • 2×350MW
  • Newly build
  • WFGD
  • 36
  • China Resources Electric Power (Tangshan Caofeidian) Co., Ltd. Phase I Ultra-low Emission Renovation Project EPC Project General Contract for Desulfurization and Capacity Enhancement Renovation
  • 2×300MW
  • Reform
  • WFGD
  • 37
  • Revamping of 2 x 330MW Ultra-clean Integrated Desulfurization in Huaxin Power Plant of Xuzhou, Huarun
  • 2×330MW
  • Reform
  • WFGD
  • 38
  • EPC General Contracting Project for Integrative Reform of Flue Gas Ultra-Low Emission Desulfurization and Dust Collection of 2 x 330 MW Units in Huarun Electric Power Hubei Co., Ltd.
  • 2×330MW
  • Reform
  • WFGD
  • 39
  • Inner Mongolia Mengduan Huaneng Thermal Power Co., Ltd. Wuhai Power Plant Unit 5-6 Ultra-low Emission Renovation Project
  • 2×330MW
  • Reform
  • WFGD
  • 40
  • Ultra-low Emission Revamping Project for Desulfurization System of 2 *330 MW Unit in Datang Lubei Power Generation Co., Ltd.
  • 2×330MW
  • Reform
  • Magnesium desulfurization
  • 41
  • Ultra-low Emission Revamping Project for Desulfurization of Unit 1 and Unit 2 of Huaneng Yueyang Power Plant (2*362.5MW)
  • 2×362.5MW
  • Reform
  • WFGD
  • 42
  • Gansu Power Investment Jinchang Power Generation Co., Ltd. (No. 1 Plant) EPC General Contract for Ultra-Low Emission Flue Gas Desulfurization Reform
  • 2×330MW
  • Reform
  • WFGD
  • 43
  • EPC Project General Contracting Project for Ultra-Low Emission Revamping of 2 x 330 MW Units in Jinchang Power Generation Co., Ltd. of Gansu Electricity Investment
  • 2×330MW
  • Reform
  • WFGD
  • 44
  • Improvement of flue gas desulfurization and efficiency of Huaneng Jingmen Thermal Power Unit 1 and 2
  • 2×330MW
  • Reform
  • WFGD
  • 45
  • Renovation Project of Desulfurization and Efficiency Improvement for Unit 1 of Huaneng Nanjing Power Plant
  • 1×320MW
  • Reform
  • WFGD
  • 46
  • Revamping Project for Desulfurization and Efficiency Improvement of Unit 4 in Huaneng Yangluo Power Plant
  • 1×300MW
  • Reform
  • WFGD
  • 47
  • Huarun (Lianyuan) Co., Ltd. Integrated EPC Project for Desulfurization and Dust Removal of Lianyuan 1 and 2 Boilers
  • 2×330MW
  • Reform
  • WFGD
  • 48
  • EPC Project of Ultra-Low Emission Desulfurization for Units #1 and #2 in Ili Thermal Power Plant of Guotou
  • 2×330MW
  • Reform
  • WFGD
  • 49
  • EPC Project of Ultra-low Emission (Integration of Desulfurization and Dust Removal, Effectiveness Improvement of Electrostatic Precipitation and Capacity Enhancement of Induced Draft Fan) Section of U
  • 2×330MW
  • Reform
  • WFGD
  • 50
  • Jinchuan Group Co., Ltd. Unit Ultra-Low Emission Technology Project (EPC)
  • 2×150MW
  • Reform
  • WFGD
  • 51
  • EPC General Contracting for Desulfurization Device of Unit 5 # 6 # in Ultra-Low Emission Project of Zhangjiagang Changyuan Thermal Power Co., Ltd.
  • 2×220t/h
  • Reform
  • WFGD
  • 52
  • EPC General Contracting for Desulfurization Unit of Unit 7 # 8 # in Ultra-Low Emission Project of Zhangjiagang Changyuan Thermal Power Co., Ltd.
  • 2×220t/h
  • Reform
  • WFGD
  • 53
  • Revamping project of desulfurization and dust removal for ultra-low emission flue gas of 2 x 135 MW units in Hebi Coal and Electricity Co., Ltd.
  • 2×135MW
  • Reform
  • WFGD
  • 54
  • Ultra-low Emission Project of Boiler Desulfurization and Dust Removal in Ningyang Jinming Thermal Power Company
  • 2×75t/h 1×130t/h
  • Reform
  • WFGD
  • 55
  • Binzhou Public Construction Investment Development Co., Ltd. Binzhou Heating Center Phase I Desulfurization System Reform (EPC) Project
  • 4x60MW
  • Reform
  • WFGD
  • 56
  • Huaneng Yingkou Xianren Island (2x50MW) Thermoelectric New Construction Project
  • 2X50MW
  • Newly build
  • WFGD